Tower
Bridge

This award winning project was completed in 12 weeks at the end of 2016. As part of a major bridge refurbishment promgramme over 4000m2 of mastic asphalt footways, piers and approaches were replaced using hot charges supplied by IKO.

Greenpoint
House

IKO built up felt roof to 7 roofs and walkways on a new build project in North London incorporating 3 areas of green sedum roof.
If you would like to know more about this project please contact us.

Hurst
Castle

Renewal and repairs to old mastic asphalt roofs, 2500m2 of renewed asphalt with an additional 500m of crack repairs carried out in conjunction with Szerelmey and English Heritage.

Grange Hill
Station

Kemper V210 waterproofing system applied as an overlay to an existing asphalt roof with a Watco non-slip walkway.